PROJECTCASES
The company’s business revolves around “carbon.”
If you have any comments or suggestions, please call our service hotline, and we’ll provide you with excellent service.
If you’d like to learn how to get started with the project,
Please contact us.
Sanping Town 701 Wastewater Pool, Karamay Oilfield
Processing capacity: 100 tons per day
Category:
Carbonization Technology Case
Keywords:
Phone:13793500007
Email:qxf@nthbkj.com
Case Description
Basic information before processing:
Relevant indicators: The average moisture content is around 20%, with some dried samples having a moisture content of about 5%. The average oil content is 15%.
Main technical indicators after processing:
Sludge at the bottom of the tank: oil yield 12%, gas production 90 m³/T, water production 10%.
Dehydrated oil sludge: Oil yield 10%, gas yield 85 m³/T, water yield 15%.
Dried oil sludge: Oil yield 15%, gas yield 120 m³/T, water yield 10%.
After treatment, the oil content of the solid residue ranged from 0.137% to 0.071%, significantly lower than the standard requirement of less than 2%.

Relevant Cases
Case Consultation